SK-260512-01 — Sub-plan 3 Steps 1-2 closed: 55 picks ratified + research + Phase 4 14-team fixes shipped
Two distinct workstreams in one session. (1) Phase 4 admin track: PAUSE-14-team walkthrough unblocked — role-gating dead in canon (CSS short-codes sm/ce/sa vs role-switch.js ALLOWED long-codes manager/editor/agent mismatch) + last-row kebab dropdown clipped by .members-table overflow:hidden. Both surgically fixed (9 CSS selectors renamed; per-corner border-radius replacing overflow-clip + last-row upward-open kebab). 2 commits rebased on Roman's RT-260511-07 10-commit pile, pushed. (2) Started full /plan for Sub-plan 3 (buyer-profile-and-presentation, Phase 1.11.1-5). Closed Step 1 Interview (Blocks 1→5g, 55 picks ratified) + Step 2 Research (3 parallel Perplexity queries, 4 industry validations + Pick #25 amended to 3-heart localStorage threshold post-research). Phase 1.11.5 REDEFINED to 'Anonymous inbound lead capture' replacing 'Buyer login' (DROPPED per Pick #1 no-buyer-password). User paused before Step 3-5; resume next session.